Start from the pack, not the machine

Most buyers start with the machine: what is the fastest model, what is the price, what does the catalogue say. Then they buy a unit whose rated speed is far above what their line will ever run, and pay for capacity they never use.

Start from the pack instead. Three numbers decide the machine you need.

1. Packs per shift. Count the packs that actually leave the counter or line in a shift, on a normal day, not a good day. If you do not have the number, count for one hour and multiply.

2. Peak hour. A fresh counter is not flat. The two hours after opening and the two hours before closing usually carry most of the volume. A machine is sized for the peak, not for the average, because that is when queueing appears.

Three numbers that set the requirement

3. Changeovers. How many times a shift do staff switch tray size, product or film? Every changeover costs a few minutes. A machine that changes quickly is worth more than one that runs faster but needs twenty minutes to reset.

Turn the peak hour into a rate. If the peak hour produces 900 packs, that is 15 packs per minute. Add a working buffer of 10 to 20 percent for stops, film changes and uneven flow. You are now looking at roughly 17 to 18 packs per minute.

Now read the specification honestly. A machine rated at 15 packs per minute will not deliver 15 all shift. Rated speed assumes continuous feeding, a clean seal, no stops and an operator who only loads. Real output sits below that. If your requirement is 18, a machine rated at 20 is the sensible match, not one rated at 30 and not one rated at 15.

Watch for the gap between rated and running speed on the things that matter in your packing room. Does the machine need the tray positioned by hand each time? Does the film need changing every hour? Can it run your smallest tray without modification? Those details decide whether the rated number survives contact with a shift.

Turning packs into a machine rate

If your number lands between two models, ask what the next size up actually buys. Sometimes it is speed; often it is only a larger frame. Buying the smaller model and running two shifts is frequently cheaper than buying the model above and running one.

Finally, check the consumable rate. At 18 packs per minute, film consumption per shift is easy to work out, and it is often the larger cost than the machine itself over three years.

Write the three numbers down before you speak to any supplier. A supplier who asks for them is sizing a machine to your work. A supplier who does not is selling a catalogue item.

Send us your pack per shift, your peak hour and your tray range, and we will tell you which model fits, including when the answer is a smaller one than you expected.