Manual tying is inconsistent
Hand tying one bundle at a time ties output to headcount, and tightness varies.

Bundling for cable harnesses, cables, tubes and electronic components, configured around bundle diameter, length and daily volume with 30 mm dedicated PE film.
Harnesses, cables, tubes and electronic components are usually bundled before packing. Bundle diameter, length, weight and daily volume all affect the machine and film configuration, so each case is confirmed against a real sample. The automatic film bundling machine uses 30 mm dedicated PE film, runs at about 1,800 cycles per hour and covers bundle diameters from 30 to 145 mm; automatic and manual modes suit different batch sizes. For larger diameters or special film requirements, send a sample and site information so we can confirm a separate plan. Send one or two real harness bundles for a trial to confirm film width, tie position and tightness before discussing machine count and line layout.
Hand tying one bundle at a time ties output to headcount, and tightness varies.
Diameters, lengths and materials differ, so coverage must be checked case by case.
Wrong film width or tension gives loose bundles and higher film use.

Automatic film bundling at about 1,800 cycles per hour
Product details ↗
30 mm dedicated PE film from the same factory
Product details ↗Diameter, length and weight of harnesses, cables, tubes or components.
Daily bundle count and shifts, to size single or dual stations.
30 mm dedicated PE film, table space, outlet direction and handling.
30–145 mm; larger bundles need a sample check.
About 1,800 cycles per hour; actual output depends on material and operation.
Yes, 30 mm PE dedicated film; other widths or materials need a sample check.

Harness bundles were tied by hand; after switching to machine bundling, the customer assesses output at about three times the manual rate with the same headcount.
Share the product, pack format and working conditions. Messages are welcome at any time; our team responds during office hours.